Skip to content

A1089 to A13 link road closure near Grays carries 10 - 30 mins expected delay

The northbound A1089 link from Marshfoot to the westbound A13 is due to close for drainage works from 10:00pm on Monday 16 November 2026. Drivers are advised to use a diversion via Local Authorities and National Highways Network.

By · Published

Photo: David Dixon via Wikimedia Commons, CC BY-SA 2.0

In this article9 sections
  1. Key takeaways
  2. Which A1089 and A13 link is closing near Grays?
  3. How much extra time should drivers allow?
  4. Where can drivers check for updates before setting off?
  5. About the figures
  6. Official records behind this story
  7. Sources
  8. Further reading
  9. Related topics and towns

Key takeaways

  • Roads: A1089A13
  • Starts: 10:00pm on Monday 16 November 2026
  • Planned end: 5:30am on Tuesday 24 November 2026

Drivers joining the westbound A13 from the northbound A1089 at Marshfoot near Grays should expect moderate delays of 10 - 30 mins during the planned closure.

The works are scheduled to start at 10:00pm on Monday 16 November 2026 and end at 5:30am on Tuesday 24 November 2026.

The closure affects the northbound A1089 link road from Marshfoot to the westbound A13. Both a lane and the link road are listed as closed for drainage works.

How much extra time should drivers allow?

National Highways classifies the expected delay as moderate: 10 - 30 mins. This is an estimate for journeys affected by the works, not a guaranteed delay for every driver.

The diversion is via Local Authorities and National Highways Network. The notice does not name the individual roads on the diversion, so drivers should check the signed route before travelling.

Where can drivers check for updates before setting off?

Check National Highways live travel updates before leaving, and follow signs for the diversion. For information about local roads, visit Essex Highways.

About the figures

National Highways published the planned roadworks notice on 7 September 2026. It covers the scheduled closure from 16 November 2026 to 24 November 2026. National Highways says planned works are not real-time information and can change close to the start.

Official records behind this story

Related topics and towns