The A120 between West Street and Colchester Road is listed for a carriageway closure in both directions from 9 November 2026 to 28 November 2026. National Highways expects Severe (more than 30 mins) delays; a diversion route is planned, but the listing does not name its roads.
Drivers also face closures and lane restrictions on the A12, M25, M11, A282, A1089 and A2. The tables show the listed dates, locations and expected delay bands.
What does the A120 closure mean for journeys?
The A120 listing covers both directions between West Street and Colchester Road. It gives a diversion route but no route details, so drivers should check the live notices before setting off. The stated delay band is more than 30 mins.
The listed period is 9 November 2026 to 28 November 2026. The notice gives dates, not the hours when the closure will operate.
Which A12 and A120 junctions are affected?
| Road and location | Direction and work | Listed period | Expected delay | Diversion information |
|---|---|---|---|---|
| A120, West Street to Colchester Road | Both directions; carriageway closure | 9 November 2026 to 28 November 2026 | Severe (more than 30 mins) | Diversion route listed; roads not specified |
| A12, junction 29 | Both directions; drainage works and carriageway closure | 19 October 2026 to 25 January 2027 | Slight (less than 10 mins) | Not specified |
| A12, junction 27 to junction 28 | Northbound; carriageway reconstruction | 11 November 2026 to 23 November 2026 | Moderate (10 - 30 mins) | Not specified |
| A12, M25 junction 28 / A12 junction 11 to Ingatestone | Both directions; litter clearance and carriageway closure | 16 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| A12, junction 12 to junction 11 | Southbound; signs maintenance and carriageway closure | 21 November 2026 to 23 November 2026 | Moderate (10 - 30 mins) | Not specified |
| A12, Park Lane | Northbound entry and exit slip roads; closures | 23 November 2026 to 4 December 2026 | Slight (less than 10 mins) | Not specified |
| A12, junction 18 to junction 19 | Northbound; lane closure for cutting and planting | 23 November 2026 to 28 November 2026 | Slight (less than 10 mins) | Not specified |
| A12, junction 22 to junction 25 | Both directions; lane closure for sweeping | 23 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| A12, junction 27 to junction 29 | Both directions; carriageway closure for structure maintenance | 23 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Not specified |
| A12, junction 25 to junction 23 | Southbound; carriageway closure for communications | 23 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| A120 Galleys Corner roundabout to A12 junction 22 | Both directions; lane closures for sign erection | 23 November 2026 to 28 November 2026 | Slight (less than 10 mins) | Not specified |
Source: National Highways planned roadworks listings, covering works scheduled from 19 October 2026 to 25 January 2027.
What is closing on the M25, M11, A282, A1089 and A2?
| Road and location | Direction and work | Listed period | Expected delay | Diversion information |
|---|---|---|---|---|
| M25, junction 25 to junction 27 | Clockwise; carriageway and lane closure for routine maintenance | 23 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Via local authorities and National Highways network |
| M25, QEII Bridge junction 31 to A282 southbound junction 2 | Clockwise; lane, link and slip road closures for resurfacing | 23 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Via National Highways and local authorities network |
| M25, junction 26 to junction 25 | Anti-clockwise; lane closure for electrical works | 23 November 2026 to 28 November 2026 | Slight (less than 10 mins) | Not specified |
| M25, junction 29 to junction 30 | Clockwise; carriageway, slip road and lane closures for resurfacing | 23 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Via local authorities and National Highways network |
| M11, junction 4 to junction 5 | Northbound; lane closure for safety fence repairs | 23 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| M11, junction 5 to junction 4 | Southbound; lane closure for safety fence repairs | 23 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| A406 Redbridge roundabout to M11 northbound junction 4 link road | Westbound; link road closure for carriageway repairs | 23 November 2026 to 27 November 2026 | Moderate (10 - 30 mins) | Via local authorities and National Highways network |
| M11, junction 7A to junction 7 | Southbound; lane closure for cutting and planting | 23 November 2026 to 26 November 2026 | Slight (less than 10 mins) | Not specified |
| M11, Thremwell Avenue to junction 8 | Southbound; carriageway closure for drainage | 23 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Not specified |
| A2, Merry Chest to Hall Road | Both directions; lane closure for barrier repair | 23 November 2026 to 24 November 2026 | Slight (less than 10 mins) | Not specified |
| A282, Dartford Crossing East Tunnel | Northbound; tunnel closure for maintenance | 22 November 2026 to 23 November 2026 | Moderate (10 - 30 mins) | Via National Highways network |
| A282, Dartford Crossing West Tunnel | Northbound; tunnel closure for maintenance | 2 November 2026 to 28 November 2026 | Moderate (10 - 30 mins) | Via National Highways network |
| A1089 Marshfoot to A13 westbound link road | Northbound; lane and link road closure for drainage | 16 November 2026 to 24 November 2026 | Moderate (10 - 30 mins) | Via local authorities and National Highways network |
Source: National Highways planned roadworks listings, covering works scheduled from 2 November 2026 to 28 November 2026.
What should drivers check before setting off?
Check National Highways live travel updates for current closures, diversions and delays. For local roadworks, check Essex Highways.
About the figures
National Highways published the planned roadworks listings between 22 January 2026 and 12 November 2026. The scheduled periods shown here run from 19 October 2026 to 25 January 2027. The listings give expected delay bands and work dates, but do not state daily working hours for most closures.


























