Skip to content

A120 eastbound closure ends Wednesday as Coggeshall works bring longer delays

The A120 closure between Blake End and Rayne is due to end at 5:00am on Wednesday 18 November. But the Coggeshall Bypass closure continues until Saturday 28 November, with severe delays expected.

By · Published

Photo: David Howard via Wikimedia Commons, CC BY-SA 2.0

In this article9 sections
  1. Key takeaways
  2. Which Essex roadworks continue after Wednesday 18 November?
  3. Which roadworks list a diversion?
  4. What should drivers check before setting off?
  5. About the figures
  6. Official records behind this story
  7. Sources
  8. Further reading
  9. Related topics and towns

Key takeaways

  • A12, A120, A14, M25: 9:00pm on Monday 5 October 2026 to 5:00am on Thursday 19 November 2026
  • A12, A120: 9:00pm on Monday 19 October 2026 to 5:00am on Monday 25 January 2027
  • A282: 9:00pm on Monday 2 November 2026 to 5:30am on Saturday 28 November 2026

The eastbound A120 between Blake End and Rayne is due to reopen at 5:00am on Wednesday 18 November, after barrier and fence repairs that began at 8:00pm on Monday 16 November. National Highways expects moderate delays of 10 - 30 mins while it is closed.

A separate closure on the A120 at Coggeshall is scheduled to continue in both directions until 6:00am on Saturday 28 November. It has the highest delay rating among the listed works: severe, or more than 30 mins. A diversion is listed, but its route is not given in the notice.

Which Essex roadworks continue after Wednesday 18 November?

The table shows restrictions scheduled to remain in place beyond Wednesday, alongside the A120 closure due to end that morning. Check the notice for your route: some works close a carriageway, while others restrict lanes or slip roads.

Road and directionSection and workScheduled endExpected delay
A120 eastboundBlake End to Rayne; carriageway closure for barrier and fence repairs18 NovemberModerate (10 - 30 mins)
A120 both directionsWest Street to Colchester Road, Coggeshall Bypass; carriageway closure and diversion28 NovemberSevere (more than 30 mins)
A12 northboundJunction 27 to Junction 28; carriageway reconstruction23 NovemberModerate (10 - 30 mins)
A12 both directionsM25 Junction 28/A12 Junction 11 to Ingatestone; litter clearance closure24 NovemberSlight (less than 10 mins)
A12 both directionsJunction 29; drainage closure25 January 2027Slight (less than 10 mins)
A12 both directionsCopdock Roundabout to Junction 11; mobile lane and slip-road closures for horticulture19 NovemberSlight (less than 10 mins)
A12 southboundJunction 22 to Junction 19; carriageway sweeping lane closure20 NovemberSlight (less than 10 mins)
A12 both directionsJunction 11 to Junction 33; mobile lane closures for drainage21 NovemberSlight (less than 10 mins)
A282 northboundDartford Crossing West Tunnel; maintenance closure28 NovemberModerate (10 - 30 mins)
M11 southboundJunction 7A to Junction 7; lane closure for horticulture19 NovemberSlight (less than 10 mins)
M25 anti-clockwiseJunction 27 to Junction 25; carriageway and lane closure for maintenance21 NovemberModerate (10 - 30 mins)
M25 clockwiseJunction 28 to Junction 29; lane closure for Lower Thames Crossing works21 NovemberSlight (less than 10 mins)
M25 anti-clockwiseJunction 31 slip road and lane; testing works21 NovemberModerate (10 - 30 mins)
A1089 northboundMarshfoot to A13 westbound link road; drainage lane and link-road closure24 NovemberModerate (10 - 30 mins)

Source: National Highways planned roadworks, for works scheduled from 5 October 2026 to 25 January 2027; notices were published between 20 August 2025 and 13 November 2026.

The Coggeshall Bypass closure has the most severe stated delay rating in the table. The M25 closure between Junction 27 and Junction 25 and the A1089 link-road closure are also rated moderate. The A12 closure between Junction 27 and Junction 28 is scheduled to continue until 5:00am on Monday 23 November.

Which roadworks list a diversion?

The A120 Coggeshall Bypass notice says a diversion route is in place, but does not name the roads on that route. The M25 anti-clockwise closure between Junction 27 and Junction 25 and the A1089 northbound link-road closure list diversions via local authorities and the National Highways network. The A282 northbound Dartford Crossing West Tunnel closure lists a diversion via the National Highways network.

The A12 closure from Copdock Roundabout to Junction 11 also includes diversion routes, alongside mobile lane and slip-road closures. Check the latest route details before travelling; a lane restriction or closure can affect a different part of a journey from the main carriageway.

What should drivers check before setting off?

Check National Highways live travel updates for current closures, diversion details and delays. For local-road updates, check Essex Highways.

About the figures

National Highways published the planned roadworks notices between 20 August 2025 and 13 November 2026. They cover works scheduled from 5 October 2026 to 25 January 2027. Delay ratings are estimates, and National Highways says planned schedules can change at short notice.

Official records behind this story

Related topics and towns