Skip to content

M25 and M11 works bring moderate delays on Essex routes from Monday night

M25 restrictions between Jct 25 and Jct 27, at the Dartford Crossing and between Jct 29 and Jct 30 are each expected to cause moderate delays of 10 - 30 mins. The planned works begin on Monday 23 November 2026, with some continuing until Saturday 28 November.

By · Published

Photo: Christine Matthews via Wikimedia Commons, CC BY-SA 2.0

In this article9 sections
  1. Key takeaways
  2. Which M11 and M25 closures are planned?
  3. Which diversions are listed for the closures?
  4. How can I check the latest Essex roadworks?
  5. About the figures
  6. Official records behind this story
  7. Sources
  8. Further reading
  9. Related topics and towns

Key takeaways

  • M11, M25: 10:00pm on Monday 23 November 2026
  • A2, A282, M25: 10:00pm on Monday 23 November 2026
  • M25: 10:00pm on Monday 23 November 2026

M25 drivers should allow for moderate delays on three stretches: clockwise between Jct 25 and Jct 27, at the QEII Bridge from Jct 31 to A282 Southbound Jct 2, and clockwise between Jct 29 and Jct 30. These works are scheduled to start at 10:00pm on Monday 23 November and run through to 28 November.

M11 works include lane closures in both directions between Jct 4 and Jct 5, plus a southbound carriageway closure from Thremwell Avenue to Jct 8. Most of the listed M11 works are expected to cause slight delays of less than 10 mins, but the Jct 8 closure is rated moderate.

Which M11 and M25 closures are planned?

The M25 restrictions between Jct 25 and Jct 27 and at the Dartford Crossing are among the works carrying a moderate delay rating. The same rating applies to the Jct 29 to Jct 30 resurfacing and the M11 southbound drainage closure near Jct 8.

The Jct 4 to Jct 5 M11 safety fence repairs affect both northbound and southbound traffic, but each is rated for slight delays. The listed Jct 7A to Jct 7 horticulture work is also rated slight; a separate southbound lane closure between Jct 7 and Jct 6 is scheduled for Friday 27 November.

Which diversions are listed for the closures?

Diversions are specified for the M25 clockwise works between Jct 25 and Jct 27, at the Dartford Crossing and between Jct 29 and Jct 30, as well as for the A406 link road closure. They use the Local Authorities and National Highways Network, or, at the crossing, the National Highways and Local Authorities Network.

No diversion is listed for the other closures in the schedules. The notices do not give the diversion route roads or exact overnight reopening times, so check the latest signs and updates before setting off.

How can I check the latest Essex roadworks?

Check National Highways live travel updates before travelling. Plans can change, so check again close to your journey, especially if you use the M25, Dartford Crossing or M11.

About the figures

National Highways published the planned roadworks notices between 22 January 2026 and 6 November 2026. They cover works scheduled from 23 to 28 November 2026; the listed delay bands are estimates, and the schedules may change.

Official records behind this story

Related topics and towns