Update 12:22pm on Monday 23 November 2026
National Highways no longer lists these roadworks.
National Highways plans carriageway and lane closures on the M25 anti-clockwise between junctions 27 and 25 from 10:00pm on Monday 16 November 2026 until 5:30am on Saturday 21 November 2026.
The expected delay is moderate: 10 - 30 mins. Drivers should allow extra time for journeys through this stretch near Waltham Abbey.
What diversion is planned between M25 junctions 27 and 25?
The listed diversion is via Local Authorities and National Highways Network. The notice does not give a more specific route, so check the signs and live updates before travelling.
Why are M25 roadworks planned near Waltham Abbey?
The closures are for routine maintenance works. The notice describes carriageway and lane closures, but does not specify which lanes will be affected or give separate overnight closure times.
Where can drivers check M25 roadworks before setting off?
Check National Highways live travel updates before leaving, as planned roadworks can change. Drivers can also check Essex Highways.
About the figures
National Highways published the planned works on 28 January 2026. They are scheduled for 16 November 2026 to 21 November 2026; National Highways says future closure schedules can change at short notice.























