Drivers will not be able to join the A12 northbound from the Junction 22 entry slip near Witham while the carriageway is swept.
The closure is limited to the entry slip; the notice does not give a diversion route.
What does the A12 Junction 22 closure mean for northbound journeys?
The slip road is the northbound entrance to the A12 at Junction 22. Drivers planning to join there should allow for a different route during the closure; National Highways expects delays of less than 10 mins.
What other A12 roadworks are scheduled near Witham?
Other planned works are listed nearby on Tuesday 24 November, with a southbound entry slip closure between Junction 21 and Junction 20, and on Wednesday 25 November, with a northbound carriageway closure between Hatfield Peverel and Witham for an inspection survey.
How can drivers check for changes before travelling?
Check National Highways live travel updates before setting off, as planned closures can change. Drivers can also check Essex Highways.
About the figures
National Highways’ planned roadworks notice, published on 16 October 2026, gives the closure times and expected delay. The works are scheduled from 26 November 2026 to 28 November 2026; planned timings may change.























