Skip to content

A120 Coggeshall closure tops Essex roadworks delays as A12 works run to January

The A120 is due to close in both directions through Coggeshall until 6:00am on Saturday 28 November, with severe delays of more than 30 mins expected. A separate A12 closure at Jct 29 is scheduled to continue until 5:00am on Monday 25 January 2027, although National Highways expects only slight delays there.

By · Published

Photo: Robert Edwards via Wikimedia Commons, CC BY-SA 2.0

In this article9 sections
  1. Key takeaways
  2. Where are the Essex roadworks and how long will they last?
  3. Which other closures could affect journeys?
  4. What should drivers check before setting off?
  5. About the figures
  6. Official records behind this story
  7. Sources
  8. Further reading
  9. Related topics and towns

Key takeaways

  • A12, A120, A14, M25: 9:00pm on Monday 5 October 2026 to 5:00am on Thursday 19 November 2026
  • A12, A120: 9:00pm on Monday 19 October 2026 to 5:00am on Monday 25 January 2027
  • A282: 9:00pm on Monday 2 November 2026 to 5:30am on Saturday 28 November 2026

The A120 between West Street and Colchester Road on the Coggeshall Bypass is scheduled to be closed in both directions from 8:00pm on Monday 9 November to 6:00am on Saturday 28 November. National Highways expects delays of more than 30 mins, making this the most disruptive of the listed Essex works.

The long-running A12 carriageway closure at Jct 29 affects both directions and is scheduled from 9:00pm on Monday 19 October until 5:00am on Monday 25 January 2027. Its expected delay is slight, at less than 10 mins. The contrast matters: a longer-running work does not necessarily carry the highest stated delay.

Where are the Essex roadworks and how long will they last?

Source: National Highways planned roadworks notices, covering scheduled works from 5 October 2026 to 25 January 2027.

Which other closures could affect journeys?

The A12 northbound closure between Jct 27 and Jct 28 is scheduled to end on 23 November, with moderate delays expected. On the A120, the eastbound closure between Blake End and Rayne also carries a moderate-delay rating and is due to end on 18 November.

Other listed works have slight expected delays: a lane closure on the M11 northbound between Jct 7 and Jct 7A from 17 November to 18 November; signage repairs at the A282 Jct 1A roundabouts and A206 Littlebrook Interchange Overbridge from 16 November to 17 November; and a clockwise M25 lane closure between Jct 28 and Jct 29 from 16 November to 21 November.

The notices do not give a specific route for the Coggeshall diversion. For the northbound Dartford Crossing West Tunnel closure, the stated diversion is via the National Highways Network.

What should drivers check before setting off?

Check National Highways live travel updates before travelling for current closures, diversions and journey delays. Planned schedules can change.

About the figures

National Highways published the roadworks notices between 20 August 2025 and 13 November 2026. The scheduled works covered here run from 5 October 2026 to 25 January 2027; expected delay ratings are those stated in the notices, and do not guarantee the delay on a particular journey.

Official records behind this story

Related topics and towns